Projects Reference List

Ongoing

No Customer Description End date
1 Consolidated Power Projects 220 kV Ring alongside Nairobi December 2018
2 Kenya Electricity Generating Company Limited (KenGen) Kamburu power station remedial works April 2018
3 Jianxi Water and Hydro Company A/C
Kenya Tea Development Agency Power Co. Ltd
Erection & commissioning of 5.4MW North Mathioya (3x1.8MW units).
Design of four substations for KTDA factories interconnections (Kiru, Gatunguru, Kanyenyeini & Githambo tea factories) and of 33kV transmission line from power house to the 4 factories & interconnecting it to Githambo KPLC substation.
March 2018

Completed

No Customer Description End date
1 Hexing Electrical Co. Ltd Supply, Installation and commissioning of Large power customer metering solutions November 2017
2 Andritz Hydro A/C KenGen

Kindaruma additional works:- Intake roller gates and embedded parts assembly.
Guide vane modification

October 2017
3 Kenya Electricity Generating Company Limited (KenGen) Sand blasting and painting of Kindaruma machine 1 and 2 spiral casing, guide vanes, stay vanes. September 2017
4 Kenya Power & Lighting Company (KPLC) Design, Installation and commissioning of additional power transformers at existing substations (Gigiri, Cianda & Steel Billets 66/11KV substations) June 2017
5 Kenya Power & Lighting Company (KPLC) Design, Supply, Construction, Testing and Commissioning of 1x 7.5 MVA , 33/11kV substation and associated 33kV & 11kV lines in Lamu April 2016
6 Hexing Electrical Co. Ltd Account Kenya Power Installation and commissioning of AMI smart meters with data concentrators 3,300 meters March 2017
7 Hexing Electrical Co. Ltd Account Kenya Power Installation and commissioning of Large power customer metering solutions, 5410 meters March 2017
8 Consolidated Power Projects (CONCO) RSA. KPLC Project in Kainuk Complete Civil and electro-mechanical installation works, 1x45 MVA Power Transformers capacity 220/66/11 kV Substation, including pre-commissioning tests. December 2015
9 Shyama Power Civil works for Konza 132/33 kV, 1x23 MVA substation October 2015
10 Shyama Power Civil works for Namanga 132/33 kV, 1x23 MVA substation October 2015
11 Larsen & Toubro Ltd India Completed Electro mechanical work including commissioning for 66/11kV 5MVA substation March 2015
12 Siemens Limited Erection and commissioning of 220kV Suswa substation Complete installation of 12 diameter of 1 ½ breaker scheme 220 kv 50 MVA, 220 kv reactor November 2014
13 Consolidated power projects (Pty) ltd KPLC project - Thika industrial. Complete electro-mechanical installation works, 2x45 MVA power transformers capacity 66/11 kV substation, including pre-commissioning tests November 2013
14 Andritz Hydro Kindaruma implementation of 3rd unit and rehabilitation July 2013
15 Andritz Hydro Rehabilitation of governors and control equipment at Masinga power station December 2012
16 Kenya Power & Lighting Company (KPLC) Complete erection and installation of new 132 kV sub-station equipment Extension of existing 220/132 kV substation, gas and fire detection systems, station auxiliaries, control and power cables lying, termination & transmission line works June 2011
17 Moi international airport, Mombasa Replacements of 15 no's 11 kV switch gear panels and 2 nostrum; installation, testing and commissioning Feb 2009
18 BWSC via Burhani engineers limited Complete erection and installation of new 132 kV sub-station equipment Extension of existing 220/132 kV substation, gas and fire detection systems, station auxiliaries, control and power cables lying and termination. March - Oct 2009
19 Kenya Power & Lighting Company via AREVAT & D Subcontractor Installation of 33/11 kV switchgear and power transformers at Kipevu, Bamburi, Miritini, Diani, Voi and KPRL substations in Mombasa February 2009
20 Kenya Revenue Authority, via contractor Repair and maintenance of 11kva oil circuit breaker March 2008